Reading Central

A combined goods hoist and scaffold structure was required for the refurbishment and outfit of this building.

The combined structures required a temporary works Form C together with a full method statement and risk assessment.

On-Track Consultancy carried out an independent Cat III check in accordance with NR/SP/CIV/003 for the design and successfully submitted a full works package with method statement and risk assessment to Network Rail which was accepted without comment.