On Track Consultancy | Kingston upon Thames
15859
page-template-default,page,page-id-15859,page-child,parent-pageid-15712,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-13.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

Kingston upon Thames

Positioned very near to the main station, this site was clearly visible to passing train drivers and as a result was a high profile site. As a result any plant or equipment used near to the boundary needed to be well managed with appropriate control measures in place. A fully sequenced demolition was required with a structural assessment needed for the remaining part demolished structure, prior to demolition starting.